Vehicles
EVs and everything else that moves on electrons: charging, fleets, aviation, shipping, rail.
RSS feed for Vehicles →EU BEV share hits 22.7% year to date; ABS AiP for a 151 MWh boxship
Battery-electric cars took 22.7% of EU new-car registrations in January-September 2026, up from 16.1% a year earlier, ACEA said on October 22. Hanwha Power received ABS approval in principle for a 1,700 TEU containership design with about 151 MWh of batteries, SWITCH Maritime signed a Coast Guard design basis agreement for a hydrogen fuel-cell ferry, and Dunsky launched a Canadian vehicle-grid integration alliance.

Oregon cancels I-5 NEVI charger grant, opens $15.9M third round
The Oregon Department of Transportation cancelled its NEVI grant agreement for fast chargers on I-5 south of Eugene in October 2026 and on October 21 opened a third round offering $15,949,230 across 10 highways, with applications due January 22, 2027. Oregon's first NEVI-funded station, in Gladstone, is expected to open in December 2026.

BETA's electric A250 gets FAA's first eVTOL market-survey certificate
The FAA said on October 21, 2026 it had issued BETA Technologies the first-ever Special Airworthiness Market Survey Certificate for eVTOL aircraft, authorizing the all-electric ALIA A250 to fly with operators and participants for market surveys. BETA says the first flight under it, on October 20, covered 34 nautical miles in 20 minutes.
ARENA funds JET Charge V2G trial of up to 130 ACT Government EVs
The Australian Renewable Energy Agency said on October 21, 2026 it is funding JET Charge's REVS2 project, which will deploy up to 130 EVs and bidirectional chargers across the ACT Government fleet. ARENA's project page lists A$4.1 million in ARENA funding toward a A$6.4 million project running to June 30, 2029.

CATL adds 77 kWh backup pack to swap trucks, plans 2,000 stations by 2027
CATL on October 20, 2026 unveiled a heavy-truck system pairing a leased swappable main battery with a 77 kWh on-board backup pack, added 432 and 513 kWh swap blocks, and said it plans, with partners, 900 swap stations by the end of 2026 and 2,000 by 2027.

EIA: US hybrids held 16% of Q3 2026 vehicle sales, battery EVs 6%
Hybrids were 16% of US new light-duty vehicle sales in the third quarter of 2026 and battery electric vehicles 6%, down from 10% a year earlier, the U.S. Energy Information Administration said on October 19, 2026, citing Omdia estimates.
US EV sales at a one-year high, Redwood to recycle Rivian packs, Jeju V2G
Americans bought an estimated 262,649 EVs in the third quarter of 2026, up 6.1% from the second quarter and down 39.5% from a year earlier, Cox Automotive said on October 12. Rivian and Redwood Materials said on October 14 that Redwood will recycle Rivian's manufacturing scrap and end-of-life packs, and Hyundai Motor Group said on October 16 that, based on its Jeju V2G pilot's results, EVs are set to be registered as local flexibility resources.
Global EV sales dip 2% in September as Europe sets a monthly record
Benchmark Mineral Intelligence counts 2.15 million EVs sold worldwide in September 2026, up 17% from August and down 2% year on year, for 15.5 million so far in 2026. Europe set a monthly record of almost 600,000; North America fell 44% and China 18% year on year.
Canada's EV incentive requests fell 14.3% in Q3; Quebec's share hit 52.5%
Dealerships and authorized sellers submitted 34,486 requests under the federal Electric Vehicle Affordability Program in the third quarter of 2026, worth C$151.7 million in eligible incentives and 14.3% fewer than in the second quarter, per Transport Canada data posted October 13, 2026. Quebec residents accounted for 52.5% of them.
California ZEVs took 19.1% of Q3 new-car sales; about 12,000 used MyFirstEV
Zero-emission vehicles were 19.1% of California's new light-duty sales in the third quarter of 2026, 80,392 of them, the California Energy Commission said on October 16, 2026. About 12,000 first-time EV buyers have used the MyFirstEV point-of-sale rebate since its August 2026 launch.
NSW apartment charging right, Mercedes home V2G, BMW batteries in China
New South Wales passed a law on October 15, 2026 giving apartment owners a right to install an EV charger on their lot that strata committees cannot unreasonably refuse; Mercedes-Benz launched home vehicle-to-grid charging in Germany on October 12; and BMW said on October 15 it had begun Gen6 battery production in Shenyang.
Ex-BP Dutch fast chargers change hands as US ports pass 80,000
E.ON Drive and Essent took over the former BP fast-charging network in the Netherlands, 79 sites with 370 charge points; the Electric Vehicle Council will lead an ARENA-backed national EV charging roadmap due in mid-2027; and Paren counted more than 80,000 US fast-charging ports at the end of September 2026, with Tesla's share at 49.3%.

Ember estimates EVs in oil importers displaced $20bn of crude, March-August
Ember estimated on October 14, 2026 that electric car fleets in oil-importing countries displaced 200 million barrels of crude oil, worth $20 billion, from March to August 2026 during the Hormuz energy crisis, led by China at $14 billion and EU member states at $3.1 billion. The figure is a gross counterfactual estimate. Of the 56 countries in Ember's new EV sales tracker, 49 now have a higher battery electric share of sales than the US.

EU sees China hybrid exports cut by over half; Beijing says they can grow
EU trade commissioner Maroš Šefčovič said on October 9 that an understanding to moderate Chinese hybrid and plug-in hybrid exports to the EU opens the prospect of cutting them by more than half. China's Commerce Ministry says the arrangement builds upward from the 302,000 hybrids the EU imported from China in 2025. The final decision lies at the European Council on October 15–16.

China cuts EV export VAT rebate from 13% to 9% from April 2027
China's Ministry of Finance and State Taxation Administration will lower the export VAT rebate on new energy vehicles from 13% to 9% from April 1, 2027, covering electric-only and plug-in hybrid passenger vehicles, electric-only buses and goods vehicles, and electric short-distance tractors and carts.
UK ZEHID e-trucks log 85,000 trips, about half a diesel sample's weekly km
Battery-electric trucks in the UK's ZEHID programme logged 85,000 trips and 3.60 million km by June 17, 2026, with greenhouse gas emissions 81% below diesel assuming average grid electricity, according to the programme's first annual report, by evaluator WSP for Innovate UK. They averaged about 1,350 km a week against about 2,600 km for a diesel sample and cost around 2.7 times diesel to buy; the hydrogen project HyHAUL was terminated in December 2025.

EV4EU V2X project ends; Azores homes cut charging costs 8.6% on average
EV4EU, an €8.99 million EU-funded V2X charging project coordinated by INESC-ID, closed on May 31, 2026 with a bidirectional CCS charging station prototype and pilots in Portugal, Slovenia, Greece and Denmark. Its Azores report puts the average household charging cost cut at 8.6%, ranging up to 14%; the EU's CORDIS summary of October 8, 2026 gives 14% as the average.

Volkswagen recalls 22,524 ID.4s for battery fire risk with no fix yet
Volkswagen Group of America is recalling 22,524 2023–2026 ID.4s (NHTSA recall 26V630) because the high-voltage battery may fail and lead to a fire; the root cause is unknown, owners are advised to charge to 80% at most, and interim owner letters are expected November 27, 2026. All four ID.4 traction-battery recalls since December 2025 name SK Battery America as a supplier.

Pilot opens its first Tesla Megacharger site, six stalls in Georgia
Pilot Travel Centers and Tesla have opened six Megacharger stalls for heavy electric trucks at Pilot #1390 in Ellabell, Georgia, the first site from their January 2026 deal, Pilot said on October 8, 2026. Twelve more sites are under construction, three near completion in California, Texas and Nevada; Pilot's January release expected the first sites in summer 2026 and listed New Mexico, not Indiana.

Octopus Fleet launches FleetBoost, discounted UK public charging for fleets
Octopus Fleet launched FleetBoost on 7 October 2026, discounted public charging for UK business EV fleets at MFG EV Power, IONITY and Be.EV chargers. Octopus says fleets could cut public charging bills by up to 30% and save up to £730 per vehicle a year, net of the subscription, which costs an additional £10 (ex VAT) per driver per month, assuming 15,000 miles a year at 0.3 kWh per mile.
California offers at least $28M for fast chargers, up to $100,000 a port
The California Energy Commission opened at least $28 million in Fast Charge California Project incentives on October 7, 2026, covering up to 100% of eligible costs for public DC fast chargers, at up to $100,000 per port, for ready-to-build projects applying by January 14, 2027. The $100,000 rate is for ports of 275 kW or more; a window from February 24 to May 27, 2027 pays up to $55,000 per port.

Renault and EDF plan EV, home charger and V2G bundles for French homes
Renault Group and EDF said on October 8, 2026 that they aim to sell French households an electric vehicle, a home charger installed by IZI by EDF and smart charging management through Renault Group dealers, with bidirectional services for single-family homes, and expect the offers to roll out by summer 2027. They put V2G savings at the equivalent of up to 10,000 km of driving a year but give no prices. Renault launched a V2G offer in France with The Mobility House in 2024.

Tesla turns on Powershare home backup for new Model 3 and Model Y
Tesla Energy said on October 6, 2026 that Powershare Home Backup is available for new Model 3 and Model Y with a Powerwall 3, extending home backup by over two days per Tesla. Its Powershare page covers new orders from October 1, 2026, narrowed in a footnote to US and Puerto Rico orders after that date, says some but not all earlier cars are capable, and offers the two models no setup without a Powerwall.

Australian BEV share eases to 24.2% in September on FCAI's count
Battery-electric vehicles took 24.2% of Australia's new vehicle market in September 2026, the Federal Chamber of Automotive Industries said on October 6, below the record 24.9% it reported for August and up from 11.3% in September 2025. The Driven counts 26,087 EVs against 26,018 petrol cars, a second straight month ahead of petrol.
Renew Home, now Everyday Electric, buys connected-car platform Smartcar
Renew Home renamed itself Everyday Electric on October 6, 2026, introduced a whole-home Everyday VPP with HVAC, EV, EVSE, storage and solar OEM partners, and said it acquired connected-vehicle platform Smartcar for managed charging in utility programs, without disclosing terms. It claims 6+ GW of capacity and a five-year goal of over $5 billion in household savings that counts avoided system costs for all households its energy provider partners serve.
Ampol agrees to buy Evie Networks and its 1,031 charging bays for A$225M
Ampol agreed on October 1, 2026 to buy Fast Cities Australia (Evie Networks) for A$225 million, adding more than 1,030 public charging bays for a combined network of about 1,425 bays at over 400 sites. Ampol anticipates breakeven EBITDA for the combined charging business in 2028 and targets annualised EBITDA of $30 million, including synergies, from Evie and its Energy Solutions unit within three years of completion, which is targeted for the first half of 2027 subject to ACCC clearance.

Honda and Taisei test in-road wireless charging built for 20-ton trucks
Honda and Taisei said on October 5, 2026 that Honda R&D, Taisei Corporation and Taisei Rotec have developed the underlying technology for a magnetic coupling wireless charging road for moving EVs, with ground units and pavement built to withstand vehicles of approximately 20 tons gross weight, tested at Taisei's T-FIELD/SATTE test road. Taisei says the system is designed for up to 150 kW; neither company reports a measured power level. The team is one of two scheduled for NEXCO East's roughly 300-meter Tateyama Expressway trial from fiscal 2027.

BMW opens Irlbach-Straßkirchen plant to assemble Neue Klasse batteries
BMW Group opened its around €1 billion Irlbach-Straßkirchen plant in Bavaria on October 1, 2026, starting two-shift series production of sixth-generation high-voltage batteries for the new BMW i3 built in Munich. The plant assembles packs from cells BMW says come from leading cell manufacturers, which the release does not name; at full operation it expects around 1,600 employees and several hundred batteries a day on two lines, with no GWh capacity given.

MiSpeL lets German home batteries mix grid power, on direct-marketing terms
Germany's Bundesnetzagentur adopted the MiSpeL determination on October 1, 2026, letting batteries and bidirectional EV charge points store grid power alongside solar while keeping the EEG market premium on the solar share and levy relief on stored grid power. The premium requires direct marketing, the flat-rate option for arrays up to 30 kWp awaits EU state-aid approval, and until September 30, 2027 use needs grid and meter operator consent.

Norway's new vans were 74.6% electric in September after a tax increase
Electric vans took 74.6% of Norway's 2,036 new van registrations in September 2026, a share the Norwegian Road Federation (OFV) calls a record. New diesel vans fell 70% from September 2025, to 468, after the one-time registration tax on combustion-engine vans rose on September 1, 2026, while new electric vans rose 22% to 1,518. Of the 526,284 vans on Norwegian roads, 85% are diesel, and nearly nine in ten vans that changed owners in September were diesel.