#electric vehicles
Schneider Electric launches a home EV charger that manages panel load
Schneider Electric launched Schneider Charge on August 25, 2026: an 11.5 kW (48 A) Level 2 residential EV charger for the United States and Canada with built-in SmartAmp dynamic load management that adjusts charging speed to the home's real-time electrical load, supporting UL 3141 managed-load installations where accepted by the authority having jurisdiction. It ships in NACS (J3400) and J1772 versions; a plug-in model is planned for early 2027.
PG&E expands V2X program to Nissan, Volvo, Polestar, and Kia EVs
PG&E expanded its Vehicle-to-Everything program on August 24, 2026: the Nissan Leaf, Volvo EX90, and Polestar 3 with dcbel's Ara charger, and the Kia EV9 and EV6 with the Wallbox Quasar 2, are now eligible alongside new partners Bidirectional Energy and PowerFlex. Residential incentives run $2,500 to $4,500, PG&E says the new vehicle-and-charger combinations qualify for up to $13,000 in California Energy Commission grant funding subject to additional eligibility requirements, and enrollment stays open through June 30, 2027.

GridLab: V2G could supply 30% of California's utility-scale storage target
A GridLab, Kevala, and E3 report released in August 2026 and announced on August 18 finds that enrolling 10 percent of the 9.7 million light-duty EVs California projects for 2036 in vehicle-to-grid programs could supply 30 percent of the state's cumulative utility-scale storage procurement target, if V2G resources are accredited on a comparable basis with grid-scale storage. The report recommends replacing California's fragmented demand-flexibility programs with standardized products that pay only for measured performance, below verified avoided costs.
