The Duck Curve
Home EnergyGridVehiclesPolicyTech Reference

#renewable energy certificates

  • Google-sponsored pilot charged and discharged 9.2 GWh at esVolta batteries

    Quintrace, esVolta and LevelTen Energy announced on September 17, 2026 the results of a Google-sponsored pilot in which esVolta's Anole (240 MW / 480 MWh) and Burksol (100 MW / 200 MWh) batteries in Texas charged and discharged a total of 9.2 GWh over three months in defined mid-day and evening windows, each hour verified by Quintrace against the EnergyTag standard. Google contracted to time-shift environmental attributes it already owned without tolling the batteries or taking merchant or dispatch risk; the release calls it the first environmental revenue stream for battery assets.

    Sep 20, 2026
    Six men in white hard hats and high-visibility vests toss shovelfuls of dirt between two loader buckets at esVolta's Boxcar groundbreaking, with a light-green sign at right headed esVolta - Boxcar in white lettering above a white inset panel, and bare trees behind

© The Duck Curve

Site About Reference pages Archive Tags Search Privacy Contact
Explainers What is the duck curve?kW vs kWhWhat is a virtual power plant?What is an interconnection queue?What are SMRs and microreactors?
Feeds All articles Home EnergyGridVehiclesPolicyTech
Social X