#netherlands
Registered Dutch home batteries reach about 1.1 GW before net metering ends
The Netherlands had about 89,000 home batteries registered with grid operators at the end of October 2026, totalling about 1.1 GW against 0.3 GW at the end of October 2025, the ACM reported on November 12. Net metering for households with solar panels ends on January 1, 2027.
Dutch cabinet plans hybrid heat pump standard for boiler swaps from 2029
Dutch Housing Minister Elanor Boekholt-O'Sullivan told parliament on October 7, 2026 that the cabinet intends, from 2029, to make a smart hybrid heat pump or a more efficient system the standard in many cases when a gas boiler is replaced, through a tightened efficiency requirement in the Buildings Decree. Apartment buildings, listed monuments and homes soon joining a heat network are expected to be left out, and publication of the decree changes is foreseen for mid-2028.
