Mazama says CO2-cooled drilling ran 20% faster in 645°F Oregon rock
Mazama Energy says its Carbon Chill system, which uses supercritical carbon dioxide as a drilling fluid, cooled its bottom hole assembly to 195°F in 645°F rock during an August 2026 test at its Athena project in Newberry, Oregon, and drilled 20% faster than conventional drilling, at 92 feet per hour. The company calls it the first field use of the method in a deep geothermal well.