#byd
Geely says new station peaks at 2,250 kW, test cars took 4.5 minutes to 70%
Geely Auto Group said on September 23, 2026 it introduced Geely Smart Charging, an AI-managed charging system, alongside a fifth-generation Geely Smart Charging Station it says delivers peak charging power of up to 2,250 kW. In tests it calls real-world, the battery used in the Lynk & Co 10 and Zeekr 001 charged from 10% to 70% in 4 minutes 30 seconds and from 10% to 97% in 8 minutes 40 seconds. The release names no pack capacity, test temperature or price; CnEVPost puts BYD's flash charger at a maximum of 1,500 kW per connector and its network at 11,586 stations in China as of September 24.

BYD Sealion 7 joins Amber's ARENA-backed V2G program in Australia
Amber Electric and BYD Australia announced on September 18, 2026 that the Sealion 7 joins Amber's vehicle-to-grid program, which Amber calls Australia's largest live V2G program, scaling to 1,000 households with A$13.6 million more from ARENA (May 29, 2026). The release says Sealion 7 owners in the program will have their EV battery covered under BYD's warranty support and that participants will be able to buy eligible Atto 3 or Sealion 7 variants at six per cent off the base RRP; as of September 20, 2026 the eligibility list and discount offer on Amber's program page name only the Atto 3.